Tokuda Hospital

The fact that the current hospital lags behind the developing technology, insufficient capacity, lack of desired functionality due to the confusion of service, patient and visitor flows, and the difficulties experienced during the operation phase required the need for new projects.

Year

2019

Regıon

Bulgaristan

Area

57.500 sqm

Number of Beds

775

Tokuda Hospital

The fact that the current hospital lags behind the developing technology, insufficient capacity, lack of desired functionality due to the confusion of service, patient and visitor flows, and the difficulties experienced during the operation phase required the need for new projects. Our team has taken the needs and demands and started the renovation project of the hospital with its own knowledge.

Particularly in the medical field, studies have been intensified and infrastructure requirements and functionality requirements have been reflected in all projects.

During the construction phase of the project, supervisory and consultancy services has provided in the field to ensure the correct implementation of the project and to solve the problems that arise during the process as soon as possible without creating additional budget.

  • Info

    Client: Acıbadem City Clinic
    Location: Sofia/ Bulgaria
    Services: Renovation (Design, Medical Planning, Construction Scenerio Planning, Phasing )
    Total area: 57.500m²
    Beds: 775

  • BIM
    • A-Exterior- (1).jpg
    • A-Exterior- (2).jpg
    • A-Exterior- (3).jpg
    • A-Exterior- (4).jpg
    • A-Exterior- (5).jpg
    • A-Exterior- (6).jpg
    • Interior-1.jpg
    • Interior-10.jpg
    • Interior-2.jpg
    • Interior-3.jpg
    • Interior-4.jpg
    • Interior-5.jpg
    • Interior-6.jpg
    • Interior-7.jpg
    • Interior-8.jpg
    • Interior-9.jpg
  • Videos